Mirabito RLM Pt.2 - Eniz Ozden; Korkut Balta; Muhammad Selim Albayrak;
From CS486wiki
Week 1: 02/14/2025
Accomplishments:
- Gave a presentation to project managers detailing our current status and outlining what needs to be done for the work ahead.
To-Do:
- Define the project scope.
- Work on Capture and Auth requests.
Week 2: 09/19/2024
Objectives and Tasks:
- Development Environment Configuration:
- Set up the C#/.NET environment. - Configure the TCP server and integrate XML parsing tools.
- Resource Access:
- Access Mirabito Lab resources. - Retrieve relevant log files, if available.
- TCP Listener Development:
- Develop an initial TCP listener capable of accepting and storing XML messages from POS devices.
- Connectivity Testing:
- Conduct basic connectivity tests using simulated POS requests.
- Logging Mechanism Implementation:
- Establish a comprehensive logging system to capture all incoming messages for further analysis.