Mirabito 1 - Omer Tici; Ozgur Eminogle; Bugra Aydin; Ali Gorgun
From CS486wiki
Week 1 02/04/2024
Accomplishments:
● Back-end side discussed about code and new back-end member Mert learned the basics of the code. ● Code now works on machine-readable but still needs improvements. ● Front-end side looked at the design goal and planned the structure. ● System is integrated into computers.
Problems:
● There is an ETX character problem from the machine, back-end facing. ● Front-end system is going to be built from scratch.
TO-DO:
● Find a solution for the ETX character problem. ● Update inventory report to machine-readable version. ● Basic steps for the skeleton will be implemented. ● The login page will be designed as the beginning step.
Week 2 02/12/2024
Accomplishments:
● A new database will be designed and created until this week's meeting. ● The second part of the front end was created. ● The skeleton for the front end was created to have a well-organized structure.
Problems:
● Make the database match business requirements.
TO-DO:
● Update the database in the future and also update the code according to the new database. ● Starting to connect the front end with the database from the back end