Week 1
Title: Company Meeting
Date: 02/01/2019
Attendance: Umithan Goktolga, Capstone Team, William Howe
Accomplishments
- It was the first meeting for this semester. - Team meeting time decided, "4:30PM each Friday'. - Project plans for this term discussed. - Looks like data analytics and visualization related tasks going to be main part of this semester.
Problems
- There was no problem at this stage.
TODO
- Implementation of data visualization for 'optokinetic test program'.
Week 2
Title: Company Meeting
Date: 02/08/2019
Attendance: Umithan Goktolga, Capstone Team, William Howe
Accomplishments
- Repostitory of 'optokinetic test program' forked. - Data results saved into dataframes and csv files. - Visualization of the results implemented and can be checked from -> [ https://github.com/VehWare-PACE-DDP/PACE]. - Now we can see when the user missed the red box, how consistent is the 'follow red box' action. These result can be used for concussion detection.
Problems
- There was no problem at this stage.
TODO
- Integration of random sound to optokinetic test and find a correlation between sound and test results.
Week 3 & Week 4
Title: Remote Work
Date: 02/15/2019 - 02/22/2019
Attendance: Umithan Goktolga
Accomplishments
- For these two weeks, I could not attend the company meetings. - PACE member Eric, pointed out some possible errors with my modified version of optokinetic test. - I started to integrate components into the test optokinetic test.
Problems
- Possible implementation error in optokinetic test.
TODO
- Integration of random sound to optokinetic test.
Week 5
Title: Meeting Cancelled
Date: 03/01/2019
Attendance: Umithan Goktolga
Accomplishments
- For this week, our meeting with PACE team cancelled. - I am still trying to find a way to debug optokinetic test, I might need to meet with Eric individually, because first version of the program belongs to him. - Visualization of test results improved, I added axis name and figure legend into the code.
Problems
- Possible implementation error in optokinetic test.
TODO
- Integration of random sound to optokinetic test.
Week 6
Title: Company Meeting
Date: 03/08/2019
Attendance: Umithan Goktolga, Capstone Team, William Howe
Accomplishments
- This is the last meeting before break. - Mr. Howe decided to cancel the meeting on 03/15/2019, we won't able to meet for 3 weeks. - PACE team started to put together pieces for our test base. - I converted random sound into a module and import it to the main code, but because there is an infinite loop in random sound, I used 'threading' library to be able to run the whole system. - We discussed the need of implementing an UI for real human-participated tests, during the break I am going to work for implementing it. - The new integrated version of the code can be checked from -> [1].
Problems
- Possible implementation error in optokinetic test.
TODO
- UI implementation for real test.