Vehware PACE -- Cihangir Umithan Goktolga

From CS486wiki
Jump to navigationJump to search

Week 1

Title: Company Meeting

Date: 02/01/2019

Attendance: Umithan Goktolga, Capstone Team, William Howe

Accomplishments

- It was the first meeting for this semester.
- Team meeting time decided, "4:30PM each Friday'.
- Project plans for this term discussed.
- Looks like data analytics and visualization related tasks going to be main part of this semester.

Problems

- There was no problem at this stage.

TODO

- Implementation of data visualization for 'optokinetic test program'.


Week 2

Title: Company Meeting

Date: 02/08/2019

Attendance: Umithan Goktolga, Capstone Team, William Howe

Accomplishments

- Repostitory of 'optokinetic test program' forked.
- Data results saved into dataframes and csv files.
- Visualization of the results implemented and can be checked from -> [ https://github.com/VehWare-PACE-DDP/PACE].
- Now we can see when the user missed the red box, how consistent is the 'follow red box' action. These result can be used for concussion detection.

Problems

- There was no problem at this stage.

TODO

- Integration of random sound to optokinetic test and find a correlation between sound and test results.


Week 3 & Week 4

Title: Remote Work

Date: 02/15/2019 - 02/22/2019

Attendance: Umithan Goktolga

Accomplishments

- For these two weeks, I could not attend the company meetings.
- PACE member Eric, pointed out some possible errors with my modified version of optokinetic test.
- I started to integrate components into the test optokinetic test.

Problems

- Possible implementation error in optokinetic test.

TODO

- Integration of random sound to optokinetic test.

Week 5

Title: Meeting Cancelled

Date: 03/01/2019

Attendance: Umithan Goktolga

Accomplishments

- For this week, our meeting with PACE team cancelled.
- I am still trying to find a way to debug optokinetic test, I might need to meet with Eric individually, because first version of the program belongs to him.
- Visualization of test results improved, I added axis name and figure legend into the code.

Problems

- Possible implementation error in optokinetic test.

TODO

- Integration of random sound to optokinetic test.


Week 6

Title: Company Meeting

Date: 03/08/2019

Attendance: Umithan Goktolga, Capstone Team, William Howe

Accomplishments

- This is the last meeting before break.
- Mr. Howe decided to cancel the meeting on 03/15/2019, we won't able to meet for 3 weeks.
- PACE team started to put together pieces for our test base.
- I converted random sound into a module and import it to the main code, but because there is an infinite loop in random sound, I used 'threading' library to be able to run the whole system.
- We discussed the need of implementing an UI for real human-participated tests, during the break I am going to work for implementing it.
- The new integrated version of the code can be checked from -> [1].

Problems

- Possible implementation error in optokinetic test.

TODO

- UI implementation for real test.