10/ |
3/10/2011<br /> |
||
--> No meeting happened with Mr. Fischman who was in vacation.<br /> |
|||
--> UI improvement still going on.<br /> |
|||
--> Data Structure improvement going on.<br /> |
|||
3/172011<br /> |
|||
We communicated each other on skype. |
|||
--> Meeting happened with all members.<br /> |
|||
Mr. Lee mentioned about our project. |
|||
--> New classes (MonteCarloContainer, ProjectSettings, MonteCarloHistory) reviewed.<br /> |
|||
We will use Monte Carlo Analysis. |
|||
--> Style of finish classes talked.<br /> |
|||
--> User interface reviewed.<br /> |
|||
3/24/2011<br /> |
|||
10/25/2010 |
|||
--> Huseyin,Alp and Mr. Fischman made a meeting.<br /> |
|||
--> Project.class reviewed.<br /> |
|||
--> First version of data structure reviewed.<br /> |
|||
--> Saved document xml file format reviewed. <br /> |
|||
--> Next meeting will data and UI merged and project will go on with one project.<br /> |
|||
3/31/2011<br /> |
|||
We talked about requirements and interface of the project. |
|||
--> We talked about DataGridView and DataGridView is added to the tabs.<br /> |
|||
--> We wanted a Monte Carlo Algorithm Example from Mr. Fischman.<br /> |
|||
We talked about improvement step of our project (Collaboration - Elaboration - Coding - Testing) |
|||
4/7/2011<br /> |
|||
11/08/2010 |
|||
--> Mr. Fischman sent us an example of Monte Carlo Analysis and we talked about this. Monte Carlo Algorithm is going to be implemented to the code.<br /> |
|||
--> We talked about DataGridView; |
|||
adding right click handler to add new column and row |
|||
adding scroll bar to see other values on DataGridView<br /> |
|||
--> Help/Contents menu is going to be done for the next week. |
|||
4/8/2011<br /> |
|||
We chose to use WinForms b |
|||
--> The meeting was done by only group members.<br /> |
|||
---- |
|||
--> Division of labor: |
|||
ecause WPA has less documents and newer than Windows Form. |
|||
Cut, Copy, Paste, Help/Contents -> Murat Can Arigun, Mehmet Talha Ugur |
|||
We decided to use Subversion. |
|||
Option / Project Parameters -> Alp Turgut |
|||
The Graph API program that we are going to use is Telerik. |
|||
TreeGridView -> Huseyin Aygan |
|||
Documentation for all code -> Ismail Maden<br /> |
|||
4/14/2011<br /> |
|||
We selected our group leader (Mehmet Talha Ugur) and group scheduler(Murat Can Arigun) but it changes on each month. |
|||
Cut/Copy/Paste was done but Mr. Fischman wanted us to make extra things for that so we talked about this. |
|||
RightClickHandler which includes "Add Column, Add New Item, Add Year" was added to TreeGridView. |
|||
Documentations were done for the last version of the project. |
|||
Help/Contents menu was shown to Mr. Fischman. |
|||
Mr. Fischman sent an example of Monte Carlo Algorithm and he gave detail information about that algorithm. |
|||
4/21/2011<br /> |
|||
We did division of labor for reading and exploring documents from internet. |
|||
Monte Carlo Algorithm was added to the project and shown to Mr. Fischman. |
|||
GUI : Mehmet Talha Ugur |
|||
We talked about ZedGraph and he wanted us to implement that graph for the next week. |
|||
Graph API : Murat Can Arigun |
|||
Data Structures – Algorithm : Alp Turgut - Huseyin Aygan |
|||
Subversion : Ismail Maden |
|||
4/28/2011<br /> |
|||
11/17/2010 |
|||
ZedGraph was implemented to the project and shown to Mr. Fischman. |
|||
Processing bar was added to Analysis tab. |
|||
The connection between Monte Carlo Analysis and the ZedGraph was told to Mr. Fischman. |
|||
We told Mr. Fischman that we will try to finish the project and shom him on the next meeting. |
|||
5/5/2011<br /> |
|||
We talked about gantt chart. |
|||
Mr. Fischman sent an example to us for About menu and wanted from us to do this. |
|||
We decided milestones of our project. |
|||
Print menu is going to be done until the next meeting. |
|||
Process Step: Agile software development method |
|||
Some small changes need to be done for graphs. |
|||
Inception : 10.18.2010 - 12.18.2010 |
|||
Elaboration : 12.18.2010 - 01.24.2011 |
|||
Collaboration : 01.24.2011 - 03.30.2011 |
|||
Transition : 03.30.2011 - 05.01.2011 |
|||
5/9/2011<br /> |
|||
11/22/2010 |
|||
Print menu was shown to Mr. Fischman. It has little problems and is going to be solved until the next meeting. |
|||
About menu was done and shown to Mr. Fischman but he wanted some little changes for the contents of that menu and sent us what we had to write |
|||
for the contents. |
|||
5/11/2011<br /> |
|||
Each member will explore about Agile Software Development on internet. |
|||
The project is done and shown to our project manager, Mr. Fischman. |
|||
We are going to conclude DFD and UML between December 18th - January 24th. |
|||
Gantt Chart is going to be sent to Mr. Fischman until Wednesday. |
|||
We did our division of labor for our project presentation. |
|||
Description of the Project |
|||
11/24/2010 |
|||
The project analyzes the given costs and benefits and help the user to figure out the results of its probability with its output. |
|||
The user can enter values for cost and benefit as inputs. |
|||
We are going to decide which project management program tool we are using for this project. |
|||
The program gets these values and shows the statistical graph to the user with the help of Monte Carlo Analysis in order to help to figure out the possibility of the project. |
|||
We talked about Gantt Chart and prepared it. |
|||
Right click added to the program, which help the user to add new item and value to the main project. |
|||
We got extra time for construction part and we lowered the time of Sprint. |
|||
The project has its own menu including File, Edit, View(Cost, Benefit, Analysis), Option (Project Parameters), Help (Contents, About). |
|||
Until December the 17th, Elaboration Process goes. |
|||
It has three tabs; Cost, Benefit and Analysis. |
|||
We construct Backlog Review on December the 18th. |
|||
TreeGridView, which shows projects and its contents, could be seen on Cost Tab and Benefit tab. |
|||
Graph on Cost and Benefit tab shows values which is entered by the user. |
|||
12/8/2010 |
|||
The analysis tab has 4 different graph. |
|||
Left upper graph shows the distribution after the program calculates the results by getting Inflation Rate and Iteration number. |
|||
Meeting with Lee, in this meeting we have started to construct Backlog Review |
|||
Left lower graph is the same graph on Cost and Benefit tab. |
|||
Right upper (Cost Tab) and right lower (Benefit Tab) pie charts illustrate the relative size of the values in the Cost tab and Benefit tab. |
|||
12/21/2010 |
|||
We have talked about the class diagram of data structure. Huseyin, Ismail, and Alp will work on the class diagrams of data structure. We have talked about tools that we can use for GUI design. (like balsamiq.com, mockupscreens.com) Talha and Muratcan will work on it. |
|||
12/23/2010 |
|||
Alternative two interface have been designed and sent to the group. First version of class diagram has been sent to the group. |
|||
1/8/2011 |
|||
Members working on data structure sent their own class diagrams seperately. |
|||
Lee Fischman sent his comments about all these, and the second version will be sent to Lee Fischman |
|||
1/21/2011 |
|||
Break ended and materials send to lee fischman and prof. steflik to review. |
|||
1/26/2011 |
|||
Meeting with Mr. Lee Fishman at 8.30 pm |
|||
--> subverison accounts requested by group and Company will provide account in this week. |
|||
--> pivotalltracker.com of backlog list will be updated in this week by group members. |
|||
--> UML diagrams was told and all of the diagrams will be combined in one week. |
|||
1/27/2011 |
|||
--> all works is shown to Prof. Steflik as a break review by Huseyin Aygan, Alp Turgut, Talha Ugur(other members got lecture because of delay). |
|||
2/05/2011 |
|||
--> all members got account from assembla.com for subversion. |
|||
--> UML diagrams combined and discussed with Mr. Fischman. |
|||
--> There will be a meeting with Mr.Fischman on campus. |
|||
--> New group leader Muratcan Arigun (marigun1@binghamton.edu) and new group secretary Huseyin Aygan (haygan1@binghamton.edu) have been selected. |
|||
2/6/2011 |
|||
--> UML diagrams reviewed by groups members. |
|||
--> UI design reviewed by group members. |
|||
2/10/2011</br> |
|||
--> Mr. Lee Fischman and Group members had meeting in G11 between 3pm and 6pm.</br> |
|||
--> UML Design finalized and decided to start implementation of final design.</br> |
|||
--> First Version User Interface is finalized and implementation of it will start next monday.</br> |
|||
--> Group wanted more detailed information for Analysis part of the project, and Mr. Fischman will provide information on that later.</br> |
|||
--> Backlog estimation was talked with Mr. Fischman and all topics will add on https://www.pivotaltracker.com/.</br> |
|||
Latest revision as of 17:22, 19 May 2011
3/10/2011
--> No meeting happened with Mr. Fischman who was in vacation.
--> UI improvement still going on.
--> Data Structure improvement going on.
3/172011
--> Meeting happened with all members.
--> New classes (MonteCarloContainer, ProjectSettings, MonteCarloHistory) reviewed.
--> Style of finish classes talked.
--> User interface reviewed.
3/24/2011
--> Huseyin,Alp and Mr. Fischman made a meeting.
--> Project.class reviewed.
--> First version of data structure reviewed.
--> Saved document xml file format reviewed.
--> Next meeting will data and UI merged and project will go on with one project.
3/31/2011
--> We talked about DataGridView and DataGridView is added to the tabs.
--> We wanted a Monte Carlo Algorithm Example from Mr. Fischman.
4/7/2011
--> Mr. Fischman sent us an example of Monte Carlo Analysis and we talked about this. Monte Carlo Algorithm is going to be implemented to the code.
--> We talked about DataGridView;
adding right click handler to add new column and row adding scroll bar to see other values on DataGridView
--> Help/Contents menu is going to be done for the next week.
4/8/2011
--> The meeting was done by only group members.
--> Division of labor:
Cut, Copy, Paste, Help/Contents -> Murat Can Arigun, Mehmet Talha Ugur
Option / Project Parameters -> Alp Turgut
TreeGridView -> Huseyin Aygan
Documentation for all code -> Ismail Maden
4/14/2011
Cut/Copy/Paste was done but Mr. Fischman wanted us to make extra things for that so we talked about this.
RightClickHandler which includes "Add Column, Add New Item, Add Year" was added to TreeGridView.
Documentations were done for the last version of the project.
Help/Contents menu was shown to Mr. Fischman.
Mr. Fischman sent an example of Monte Carlo Algorithm and he gave detail information about that algorithm.
4/21/2011
Monte Carlo Algorithm was added to the project and shown to Mr. Fischman.
We talked about ZedGraph and he wanted us to implement that graph for the next week.
4/28/2011
ZedGraph was implemented to the project and shown to Mr. Fischman.
Processing bar was added to Analysis tab.
The connection between Monte Carlo Analysis and the ZedGraph was told to Mr. Fischman.
We told Mr. Fischman that we will try to finish the project and shom him on the next meeting.
5/5/2011
Mr. Fischman sent an example to us for About menu and wanted from us to do this.
Print menu is going to be done until the next meeting.
Some small changes need to be done for graphs.
5/9/2011
Print menu was shown to Mr. Fischman. It has little problems and is going to be solved until the next meeting.
About menu was done and shown to Mr. Fischman but he wanted some little changes for the contents of that menu and sent us what we had to write
for the contents.
5/11/2011
The project is done and shown to our project manager, Mr. Fischman.
Description of the Project The project analyzes the given costs and benefits and help the user to figure out the results of its probability with its output. The user can enter values for cost and benefit as inputs. The program gets these values and shows the statistical graph to the user with the help of Monte Carlo Analysis in order to help to figure out the possibility of the project. Right click added to the program, which help the user to add new item and value to the main project. The project has its own menu including File, Edit, View(Cost, Benefit, Analysis), Option (Project Parameters), Help (Contents, About). It has three tabs; Cost, Benefit and Analysis. TreeGridView, which shows projects and its contents, could be seen on Cost Tab and Benefit tab. Graph on Cost and Benefit tab shows values which is entered by the user. The analysis tab has 4 different graph. Left upper graph shows the distribution after the program calculates the results by getting Inflation Rate and Iteration number. Left lower graph is the same graph on Cost and Benefit tab. Right upper (Cost Tab) and right lower (Benefit Tab) pie charts illustrate the relative size of the values in the Cost tab and Benefit tab.